Century-old homes near the square with no viable vent path
Why here: Pre-war construction around the Historic Downtown Square has limited exterior wall area at acceptable clearances, and the original water heater vented through a chimney or a flue that a condensing unit cannot use.
What we do: We survey the structure first and design a compliant PVC, polypropylene or Category III stainless run with a dedicated sealed termination, including concentric or roof termination where a sidewall is not workable.